We've been testing this branch for a few days, and it's looking good. We still have a a very small issue with the run-time scheduling not always propagating correctly on the edited report, but I think this is something that can be addressed by full release time.
We've been testing this branch for a few days, and it's looking good. We still have a a very small issue with the run-time scheduling not always propagating correctly on the edited report, but I think this is something that can be addressed by full release time.
Signed off on the combined branch at http:// git.evergreen- ils.org/ ?p=working/ Evergreen. git;a=shortlog; h=refs/ heads/user/ kmlussier/ lp1332138- lp1329503- reports- combined