Comment 7 for bug 2071848

Revision history for this message
Sergio Durigan Junior (sergiodj) wrote :

Thank you, Guillaume!

As mentioned in the Test Plan, I also ran our QEMU migration testsuite against the new package, and here are the results:

prep (x86_64) : Pass 25 F/S/N 0/0/0 - RC 0 (29 min 53453 lin)
migrate (x86_64) : Pass 105 F/S/N 0/0/0 - RC 999 (24 min 91793 lin)
cross (x86_64) : Pass 24 F/S/N 0/0/0 - RC 999 (42 min 45610 lin)
misc (x86_64) : Pass 103 F/S/N 0/0/0 - RC 0 (31 min 58738 lin)

The "RC 999" code is not a problem here; it just means that the test script wasn't able to fully shutdown the LXD containers used for testing. What matters is the fact that all tests passed.

Therefore, I consider this bug as verified for Noble. Tagging accordingly.