To be clear, the Plan to prep 2.9 and start on 2.10-rc0 includes the potential of falling back to 2.9 if stability/testing comes to the conclusion that 2.10 isn't ready enough.
To be clear, the Plan to prep 2.9 and start on 2.10-rc0 includes the potential of falling back to 2.9 if stability/testing comes to the conclusion that 2.10 isn't ready enough.