Comment 8 for bug 1911831

Revision history for this message
Christian Ehrhardt  (paelzer) wrote :

Hi,
As usual we will make this a two step verification.
a) First a general sniff/function test in a PPA (before we pollute -proposed too fast) via a PPA.
b) Then a proper SRU where then VMware will (as usual) do the full verification of the new builds

Now that Hirsute is somewhat final I have prepared builds of 11.2.5 for Focal and Groovy.
Those are available for the (a) checks in this PPA.
 => https://launchpad.net/~ci-train-ppa-service/+archive/ubuntu/4493/

@Vmware - could you give the builds in the PPA the usual pre-check and let us know if it looks good so I can start the full SRU-process on it?