2015-08-05 02:46:14 |
Curtis Hovey |
bug |
|
|
added bug |
2015-08-05 02:47:41 |
Curtis Hovey |
branch linked |
|
lp:~sinzui/ubuntu/wily/juju-core/wily-1.24.4 |
|
2015-08-05 02:55:37 |
Curtis Hovey |
description |
Juju 1.24.4 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: TODO
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: TODO
[sinzui] Upstream release process complete: TODO
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: TODO
[sinzui] Test juju-deployer against wily-proposed: TODO |
Juju 1.24.4 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: TODO
[sinzui] Upstream release process complete: TODO
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: TODO
[sinzui] Test juju-deployer against wily-proposed: TODO |
|
2015-08-06 22:58:24 |
Robie Basak |
bug |
|
|
added subscriber Robie Basak |
2015-08-12 16:34:19 |
Curtis Hovey |
summary |
[needs-packaging] 1.24.4 is not packaged in wily |
[needs-packaging] 1.24.5 is not packaged in wily |
|
2015-08-12 16:34:39 |
Curtis Hovey |
description |
Juju 1.24.4 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: TODO
[sinzui] Upstream release process complete: TODO
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: TODO
[sinzui] Test juju-deployer against wily-proposed: TODO |
Juju 1.24.5 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: TODO
[sinzui] Upstream release process complete: TODO
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: TODO
[sinzui] Test juju-deployer against wily-proposed: TODO |
|
2015-08-12 16:35:06 |
Curtis Hovey |
branch linked |
|
lp:~sinzui/ubuntu/wily/juju-core/wily-1.24.5 |
|
2015-08-12 16:35:13 |
Curtis Hovey |
branch unlinked |
lp:~sinzui/ubuntu/wily/juju-core/wily-1.24.4 |
|
|
2015-08-22 05:11:14 |
Nobuto Murata |
bug |
|
|
added subscriber Nobuto Murata |
2015-09-11 15:48:21 |
Wes |
bug |
|
|
added subscriber Wes |
2015-09-22 20:32:10 |
Curtis Hovey |
attachment added |
|
debian diff since comment #4 https://bugs.launchpad.net/ubuntu/+source/juju-core/+bug/1481556/+attachment/4471616/+files/debian-since-51.diff |
|
2015-09-22 20:35:13 |
Curtis Hovey |
attachment added |
|
Diff between 1.24.5 and 1.24.6 https://bugs.launchpad.net/ubuntu/+source/juju-core/+bug/1481556/+attachment/4471617/+files/1.24.5-1.24.6.diff |
|
2015-09-22 20:36:07 |
Curtis Hovey |
branch linked |
|
lp:~sinzui/ubuntu/wily/juju-core/wily-1.24.6 |
|
2015-09-22 21:07:03 |
Curtis Hovey |
summary |
[needs-packaging] 1.24.5 is not packaged in wily |
[needs-packaging] 1.24.6 is not packaged in wily |
|
2015-09-22 21:09:04 |
Curtis Hovey |
description |
Juju 1.24.5 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: TODO
[sinzui] Upstream release process complete: TODO
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: TODO
[sinzui] Test juju-deployer against wily-proposed: TODO |
Juju 1.24.6 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: TODO
[sinzui] Upstream release process complete: TODO
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: TODO
[sinzui] Test juju-deployer against wily-proposed: TODO |
|
2015-09-24 10:42:59 |
Robie Basak |
juju-core (Ubuntu): status |
New |
Fix Committed |
|
2015-09-24 10:44:42 |
Launchpad Janitor |
branch linked |
|
lp:ubuntu/wily-proposed/juju-core |
|
2015-09-24 17:51:33 |
Curtis Hovey |
description |
Juju 1.24.6 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: TODO
[sinzui] Upstream release process complete: TODO
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: TODO
[sinzui] Test juju-deployer against wily-proposed: TODO |
Juju 1.24.6 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: DONE
[sinzui] Upstream release process complete: DONE
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: TODO
[sinzui] Test juju-deployer against wily-proposed: TODO |
|
2015-09-24 18:47:08 |
Curtis Hovey |
description |
Juju 1.24.6 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: DONE
[sinzui] Upstream release process complete: DONE
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: TODO
[sinzui] Test juju-deployer against wily-proposed: TODO |
Juju 1.24.6 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: DONE
[sinzui] Upstream release process complete: DONE
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: TODO
[sinzui] Test juju-deployer against wily-proposed: DONE |
|
2015-09-24 20:22:18 |
Curtis Hovey |
description |
Juju 1.24.6 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: DONE
[sinzui] Upstream release process complete: DONE
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: TODO
[sinzui] Test juju-deployer against wily-proposed: DONE |
Juju 1.24.6 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: DONE
[sinzui] Upstream release process complete: DONE
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: DONE
[sinzui] Test juju-deployer against wily-proposed: DONE
[sinzui] Test client and cloud server upgrade from main/updates: DONE |
|
2015-09-24 20:44:45 |
Curtis Hovey |
description |
Juju 1.24.6 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: DONE
[sinzui] Upstream release process complete: DONE
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: DONE
[sinzui] Test juju-deployer against wily-proposed: DONE
[sinzui] Test client and cloud server upgrade from main/updates: DONE |
Juju 1.24.6 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: DONE
[sinzui] Upstream release process complete: DONE
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: DONE
[sinzui] Test juju-deployer against wily-proposed: DONE
[sinzui] Test client and cloud server upgrade from main/updates: DONE
[sinzui] Test client manual bootstrap and add-machine: DONE |
|
2015-09-24 20:49:08 |
Curtis Hovey |
tags |
block-proposed upgrade-software-version verification-needed |
block-proposed upgrade-software-version verification-done |
|
2015-09-28 19:38:45 |
Curtis Hovey |
description |
Juju 1.24.6 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): TODO
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: DONE
[sinzui] Upstream release process complete: DONE
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: DONE
[sinzui] Test juju-deployer against wily-proposed: DONE
[sinzui] Test client and cloud server upgrade from main/updates: DONE
[sinzui] Test client manual bootstrap and add-machine: DONE |
Juju 1.24.6 is currently proposed to be the next stable Juju release. The juju team want this version also proposed for wily. This release supports systemd for local charm development and testing
[SRU Information]
juju-core has a stable release exception in https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions, including for major version updates.
[Devel Fix]
[sinzui] Prepare source package, and diffs: DONE
[rbasak] Review package and upload of new upstream release with packaging review.
[Pre-QA tasks]
[rbasak] Upload to the development release (wily-proposed): DONE
[QA Status]
Since there are multiple verifications required, they are listed here as a work item whiteboard status type thing rather than try and track them in a single tag. Please do not mark verification-done or remove block-proposed until all following items have passed. If any of these items fail, this bug should be marked verification-failed immediately.
[sinzui] Upstream QA test against Wily: DONE
[sinzui] Upstream release process complete: DONE
Manual tests required:
[sinzui] Test juju-quickstart against wily-proposed: DONE
[sinzui] Test juju-deployer against wily-proposed: DONE
[sinzui] Test client and cloud server upgrade from main/updates: DONE
[sinzui] Test client manual bootstrap and add-machine: DONE |
|
2015-09-28 19:41:39 |
Curtis Hovey |
tags |
block-proposed upgrade-software-version verification-done |
upgrade-software-version verification-done |
|
2015-09-28 19:48:26 |
Launchpad Janitor |
juju-core (Ubuntu): status |
Fix Committed |
Fix Released |
|