Comment 22 for bug 1950916

Revision history for this message
Alfredo Moralejo (amoralej) wrote : Re: master and wallaby check/gate/periodic tests are failing tempest - updated libvirt/qemu to 6.1 from CentOS appstream

My understanding is that, before moving to rebuilding all containers, the packages update was done in a way that only the packages in the temporary repo built by dlrn in the same job and the tripleo packages in delorean-current where updated.

There was some logic in the tooling to not update deps and os packages in the container. I remember we hit some issues with some tooling but i'm pretty sure the update was done in a controlled way.