I increased the CPUs to 6 and it provisioned good, controller-0 is unlocked, enabled and available. I was able to run Installation, Provisioning and Sanity Test :)
I increased the CPUs to 6 and it provisioned good, controller-0 is unlocked, enabled and available.
I was able to run Installation, Provisioning and Sanity Test :)