Comment 4 for bug 137557

Revision history for this message
caveman (caveman-poid) wrote :

Here are two pictures, side by side. The first one is the offset schedule when our current day starts at 7:40. Then, after putting in a calender entry at 7:40 the system automatically bumps the calendar back to start at 7:00 and overlay now works.

When the start is at 7:40 and I put in a calendar entry for the first period (starting at 8:00) it shows up right at the top of the calendar so in essence is earlier than expected by 20 minutes.

I also put in an entry for 6:30 which bumped the calendar start time to 6:00 and the overlay lined up again.