Comment 8 for bug 761550

Revision history for this message
Ravi Gadhia (OpenERP) (rga-openerp) wrote :

Hello René Glauser,
          In lp:~openerp-dev/openobject-client/trunk-calendar_speed_imp-rga we improve switching between month<>week<>day same as web client (comment # 6) and it will merge soon with trunk client

         Calendar view should not display all record irrelevant of the limit. At time of switch from list view --> calendar view list view's limit should apply on calendar view. or we can change limit by action in case of direct load calendar view

         If we try to load all the records without considering the limit then it takes much time to load all the record(e.g. 1000+ event in a day) so it's not feasible as default behavior and as a result the end user needs to wait for unpredictable time to see the results.

correct me if I am missing something.

Thanks