Comment 0 for bug 740047

Revision history for this message
Jacques-Etienne Baudoux (jbaudoux) wrote :

When you create a MO (manufactuing order) with raw materials in location A and a product to consume in location B, you are forced to create manually an internal move from A to B. That's correct. However, the move generated by the 'confirm production' is from A to production instead of from B to production -> BUG. You consume from B, not from A.
The side effect is that the stock level in A is decreased twice and the stock level in B always increases.