Hello Antonie.
I tried your same scenario at my end, and I got a correct result.
Analytic costing is calculated like Number of hours * Cost per hours (which is 3.61*0.10 = 0.36) which is correct (as I got).
I have prepare a video for this and attached with this bug report, So would you please check it and notify us where you faced the problem.
Or may I missed something.
Thanks and waiting for your reply!
Hello Antonie.
I tried your same scenario at my end, and I got a correct result.
Analytic costing is calculated like Number of hours * Cost per hours (which is 3.61*0.10 = 0.36) which is correct (as I got).
I have prepare a video for this and attached with this bug report, So would you please check it and notify us where you faced the problem.
Or may I missed something.
Thanks and waiting for your reply!