I've landed the migration that can be deployed before the next DB downtime. Before that downtime we should add new columns (part of the patches in the attached branches), with triggers and garbo jobs to populate them. Then the remaining bits of these two branches should land, migrating to the new flat tables.
I've landed the migration that can be deployed before the next DB downtime. Before that downtime we should add new columns (part of the patches in the attached branches), with triggers and garbo jobs to populate them. Then the remaining bits of these two branches should land, migrating to the new flat tables.