Comment 8 for bug 542260

Revision history for this message
su_v (suv-lp) wrote :

further notes to my previous comment:

ad 2): this has changed since 0.47: revision 9076 and 9079 added 'prevent a redundant closing line segment' when converting a rectangle, star or polygon to path and when creating a path with the pen (bezier) tool.

ad 3): this is the same behavior of the 'Number Nodes…' extension as previously in 0.47: all paths listed in 2) have numbers for both (coinciding) first and last nodes.

Actually the number of nodes in a 'closed' path is ambiguous because the last redundant node is hidden from the user (e.g. in the node tool or in the status line messages) if it coincides with the first node and a 'z' command closes the path.