The next gcc-linaro release is 8 days away. If the FSF 4.4.5 release doesn't happen by, say, the 4th then we'll postpone merging it to 2010.09-0.
The next gcc-linaro release is 8 days away. If the FSF 4.4.5 release doesn't happen by, say, the 4th then we'll postpone merging it to 2010.09-0.