for my use-case it turned out that ceilometer units were needed to be shutdown (all at once) and then purging of the queue succeeded. With running ceilometer the queue was ever increasing.
for my use-case it turned out that ceilometer units were needed to be shutdown (all at once) and then purging of the queue succeeded. With running ceilometer the queue was ever increasing.