n weekly repeats break over a DST change

Bug #727248 reported by Alex Harrington
16
This bug affects 2 people
Affects Status Importance Assigned to Milestone
Xibo
Fix Released
Low
Dan Garner

Bug Description

I am currently scheduling one of our signage screens on a 2-weekly cycle to coincide with our school timetable. However, for all the times i'm scheduling after the 27th March (the change to British Summer Time), the scheduler has automatically added on an hour. Eg. Setting up a layout to start running at 9.00am every other week on Wednesday, on the 30th March onwards it is set to run at 10.00am.

See attached screenshots. The same behaviour is not apparent using a daily repeat over the same period.

Related branches

Revision history for this message
Alex Harrington (alexharrington) wrote :
Revision history for this message
Alex Harrington (alexharrington) wrote :
Changed in xibo:
status: New → Confirmed
Revision history for this message
Dan Garner (dangarner) wrote :
Dan Garner (dangarner)
no longer affects: xibo/1.3
no longer affects: xibo/1.2
Changed in xibo:
assignee: nobody → Dan Garner (dangarner)
status: Confirmed → Triaged
Changed in xibo:
milestone: 1.5.0 → 1.7.0
Dan Garner (dangarner)
Changed in xibo:
milestone: 1.7.0 → 1.6.0
Dan Garner (dangarner)
Changed in xibo:
status: Triaged → Fix Committed
Dan Garner (dangarner)
Changed in xibo:
status: Fix Committed → Fix Released
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.