Devices ----------------------- Optiarc DVD RW AD-7561S AH03 (/dev/sr0, CD-R, CD-RW, CD-ROM, DVD-ROM, DVD-R, DVD-RW, DVD-R DL, DVD+R, DVD+RW, DVD+R DL) [DVD-ROM, DVD-R Sequential, DVD-R Dual Layer Sequential, DVD-R Dual Layer Jump, DVD-RAM, DVD-RW Restricted Overwrite, DVD-RW Sequential, DVD+RW, DVD+R, DVD+R Dual Layer, CD-ROM, CD-R, CD-RW] [SAO, TAO, RAW, SAO/R96P, SAO/R96R, RAW/R16, RAW/R96P, RAW/R96R, Restricted Overwrite, Layer Jump] [%7] K3b::IsoImager ----------------------- mkisofs print size result: 117615 (240875520 bytes) System ----------------------- K3b Version: 2.0.2 KDE Version: 4.8.4 (4.8.4) QT Version: 4.8.1 Kernel: 3.2.0-26-generic-pae Used versions ----------------------- mkisofs: 3.0 cdrecord: 3.0 cdrecord ----------------------- scsidev: '/dev/sr0' devname: '/dev/sr0' scsibus: -2 target: -2 lun: -2 Warning: Open by 'devname' is unintentional and not supported. Linux sg driver version: 3.5.27 SCSI buffer size: 64512 /usr/bin/cdrecord: Warning: Cannot read drive buffer. /usr/bin/cdrecord: Warning: The DMA speed test has been skipped. Cdrecord-ProDVD-ProBD-Clone 3.00 (i686-pc-linux-gnu) Copyright (C) 1995-2010 J�rg Schilling TOC Type: 1 = CD-ROM Using libscg version 'schily-0.9'. Driveropts: 'burnfree' atapi: 1 Device type : Removable CD-ROM Version : 5 Response Format: 2 Capabilities : Vendor_info : 'Optiarc ' Identifikation : 'DVD RW AD-7561S ' Revision : 'AH03' Device seems to be: Generic mmc2 DVD-R/DVD-RW/DVD-RAM. Current: DVD-R sequential recording Profile: DVD-RAM Profile: DVD-R/DL sequential recording Profile: DVD-R/DL layer jump recording Profile: DVD+R/DL Profile: DVD+R Profile: DVD+RW Profile: DVD-RW sequential recording Profile: DVD-RW restricted overwrite Profile: DVD-R sequential recording (current) Profile: DVD-ROM Profile: CD-RW Profile: CD-R Profile: CD-ROM Profile: Removable Disk Using generic SCSI-3/mmc-2 DVD-R/DVD-RW/DVD-RAM driver (mmc_dvd). Driver flags : NO-CD DVD MMC-3 SWABAUDIO BURNFREE Supported modes: PACKET SAO LAYER_JUMP Drive buf size : 1310720 = 1280 KB FIFO size : 4194304 = 4096 KB /usr/bin/cdrecord: Data does not fit on current disk. Track 01: data 229 MB Total size: 229 MB = 117615 sectors Current Secsize: 2048 WARNING: Phys disk size 375776 differs from rzone size 0! Prerecorded disk? WARNING: Phys start: 196608 Phys end 572383 WARNING: Drive returns zero media size. Using media size from ADIP. Blocks total: 375776 Blocks current: -28688 Blocks remaining: -146303 cdrecord command: ----------------------- /usr/bin/cdrecord -v gracetime=2 dev=/dev/sr0 speed=8 -sao driveropts=burnfree -multi -data -tsize=117615s - mkisofs ----------------------- /usr/bin/mkisofs: Warning: Cannot add inode hints with -no-cache-inodes. SUSP signatures version 1 found Rock Ridge signatures version 1 found Rock Ridge id 'RRIP_1991A' 117615 /usr/bin/mkisofs: Warning: Cannot add inode hints with -no-cache-inodes. Setting input-charset to 'UTF-8' from locale. SUSP signatures version 1 found Rock Ridge signatures version 1 found Rock Ridge id 'RRIP_1991A' 77.58% done, estimate finish Sat Jul 21 13:34:47 2012 77.67% done, estimate finish Sat Jul 21 13:34:47 2012 77.77% done, estimate finish Sat Jul 21 13:34:47 2012 77.86% done, estimate finish Sat Jul 21 13:34:48 2012 77.96% done, estimate finish Sat Jul 21 13:34:48 2012 78.05% done, estimate finish Sat Jul 21 13:34:48 2012 78.15% done, estimate finish Sat Jul 21 13:34:48 2012 78.25% done, estimate finish Sat Jul 21 13:34:48 2012 78.34% done, estimate finish Sat Jul 21 13:34:48 2012 78.44% done, estimate finish Sat Jul 21 13:34:48 2012 78.53% done, estimate finish Sat Jul 21 13:34:48 2012 78.63% done, estimate finish Sat Jul 21 13:34:48 2012 78.72% done, estimate finish Sat Jul 21 13:34:48 2012 78.82% done, estimate finish Sat Jul 21 13:34:48 2012 78.92% done, estimate finish Sat Jul 21 13:34:48 2012 79.01% done, estimate finish Sat Jul 21 13:34:49 2012 79.11% done, estimate finish Sat Jul 21 13:34:49 2012 79.20% done, estimate finish Sat Jul 21 13:34:49 2012 79.30% done, estimate finish Sat Jul 21 13:34:49 2012 79.39% done, estimate finish Sat Jul 21 13:34:49 2012 79.49% done, estimate finish Sat Jul 21 13:34:49 2012 79.59% done, estimate finish Sat Jul 21 13:34:49 2012 79.68% done, estimate finish Sat Jul 21 13:34:49 2012 79.78% done, estimate finish Sat Jul 21 13:34:49 2012 79.88% done, estimate finish Sat Jul 21 13:34:49 2012 79.97% done, estimate finish Sat Jul 21 13:34:49 2012 80.07% done, estimate finish Sat Jul 21 13:34:49 2012 80.16% done, estimate finish Sat Jul 21 13:34:49 2012 80.26% done, estimate finish Sat Jul 21 13:34:50 2012 80.35% done, estimate finish Sat Jul 21 13:34:50 2012 80.45% done, estimate finish Sat Jul 21 13:34:50 2012 80.55% done, estimate finish Sat Jul 21 13:34:50 2012 80.64% done, estimate finish Sat Jul 21 13:34:50 2012 80.74% done, estimate finish Sat Jul 21 13:34:50 2012 80.83% done, estimate finish Sat Jul 21 13:34:50 2012 80.93% done, estimate finish Sat Jul 21 13:34:50 2012 81.02% done, estimate finish Sat Jul 21 13:34:50 2012 81.12% done, estimate finish Sat Jul 21 13:34:50 2012 81.21% done, estimate finish Sat Jul 21 13:34:50 2012 81.31% done, estimate finish Sat Jul 21 13:34:50 2012 81.41% done, estimate finish Sat Jul 21 13:34:51 2012 81.50% done, estimate finish Sat Jul 21 13:34:51 2012 81.60% done, estimate finish Sat Jul 21 13:34:51 2012 81.70% done, estimate finish Sat Jul 21 13:34:51 2012 81.79% done, estimate finish Sat Jul 21 13:34:51 2012 81.89% done, estimate finish Sat Jul 21 13:34:51 2012 81.98% done, estimate finish Sat Jul 21 13:34:51 2012 82.08% done, estimate finish Sat Jul 21 13:34:53 2012 82.17% done, estimate finish Sat Jul 21 13:34:53 2012 82.27% done, estimate finish Sat Jul 21 13:34:53 2012 82.37% done, estimate finish Sat Jul 21 13:34:53 2012 82.46% done, estimate finish Sat Jul 21 13:34:53 2012 82.56% done, estimate finish Sat Jul 21 13:34:53 2012 82.65% done, estimate finish Sat Jul 21 13:34:53 2012 82.75% done, estimate finish Sat Jul 21 13:34:53 2012 82.84% done, estimate finish Sat Jul 21 13:34:53 2012 82.94% done, estimate finish Sat Jul 21 13:34:53 2012 83.03% done, estimate finish Sat Jul 21 13:34:53 2012 83.13% done, estimate finish Sat Jul 21 13:34:53 2012 83.23% done, estimate finish Sat Jul 21 13:34:54 2012 83.32% done, estimate finish Sat Jul 21 13:34:54 2012 83.42% done, estimate finish Sat Jul 21 13:34:54 2012 83.51% done, estimate finish Sat Jul 21 13:34:54 2012 83.61% done, estimate finish Sat Jul 21 13:34:54 2012 83.71% done, estimate finish Sat Jul 21 13:34:54 2012 83.80% done, estimate finish Sat Jul 21 13:34:54 2012 83.90% done, estimate finish Sat Jul 21 13:34:54 2012 83.99% done, estimate finish Sat Jul 21 13:34:54 2012 84.09% done, estimate finish Sat Jul 21 13:34:54 2012 84.18% done, estimate finish Sat Jul 21 13:34:54 2012 84.28% done, estimate finish Sat Jul 21 13:34:54 2012 84.38% done, estimate finish Sat Jul 21 13:34:55 2012 84.47% done, estimate finish Sat Jul 21 13:34:55 2012 84.57% done, estimate finish Sat Jul 21 13:34:55 2012 84.66% done, estimate finish Sat Jul 21 13:34:55 2012 84.76% done, estimate finish Sat Jul 21 13:34:55 2012 84.85% done, estimate finish Sat Jul 21 13:34:55 2012 84.95% done, estimate finish Sat Jul 21 13:34:55 2012 85.05% done, estimate finish Sat Jul 21 13:34:55 2012 85.14% done, estimate finish Sat Jul 21 13:34:55 2012 85.24% done, estimate finish Sat Jul 21 13:34:55 2012 85.33% done, estimate finish Sat Jul 21 13:34:55 2012 85.43% done, estimate finish Sat Jul 21 13:34:56 2012 85.52% done, estimate finish Sat Jul 21 13:34:56 2012 85.62% done, estimate finish Sat Jul 21 13:34:56 2012 85.72% done, estimate finish Sat Jul 21 13:34:56 2012 85.81% done, estimate finish Sat Jul 21 13:34:56 2012 85.91% done, estimate finish Sat Jul 21 13:34:56 2012 86.00% done, estimate finish Sat Jul 21 13:34:57 2012 86.10% done, estimate finish Sat Jul 21 13:34:57 2012 86.19% done, estimate finish Sat Jul 21 13:34:57 2012 86.29% done, estimate finish Sat Jul 21 13:34:57 2012 86.39% done, estimate finish Sat Jul 21 13:34:57 2012 86.48% done, estimate finish Sat Jul 21 13:34:57 2012 86.58% done, estimate finish Sat Jul 21 13:34:57 2012 86.67% done, estimate finish Sat Jul 21 13:34:57 2012 86.77% done, estimate finish Sat Jul 21 13:34:57 2012 86.86% done, estimate finish Sat Jul 21 13:34:57 2012 86.96% done, estimate finish Sat Jul 21 13:34:57 2012 87.06% done, estimate finish Sat Jul 21 13:34:57 2012 87.15% done, estimate finish Sat Jul 21 13:34:58 2012 87.25% done, estimate finish Sat Jul 21 13:34:58 2012 87.34% done, estimate finish Sat Jul 21 13:34:58 2012 87.44% done, estimate finish Sat Jul 21 13:34:58 2012 87.54% done, estimate finish Sat Jul 21 13:34:58 2012 87.63% done, estimate finish Sat Jul 21 13:34:58 2012 87.73% done, estimate finish Sat Jul 21 13:34:58 2012 87.82% done, estimate finish Sat Jul 21 13:34:58 2012 87.92% done, estimate finish Sat Jul 21 13:34:58 2012 88.02% done, estimate finish Sat Jul 21 13:34:58 2012 88.11% done, estimate finish Sat Jul 21 13:34:58 2012 88.21% done, estimate finish Sat Jul 21 13:34:58 2012 88.30% done, estimate finish Sat Jul 21 13:34:59 2012 88.40% done, estimate finish Sat Jul 21 13:34:59 2012 88.49% done, estimate finish Sat Jul 21 13:34:59 2012 88.59% done, estimate finish Sat Jul 21 13:34:59 2012 88.69% done, estimate finish Sat Jul 21 13:34:59 2012 88.78% done, estimate finish Sat Jul 21 13:34:59 2012 88.88% done, estimate finish Sat Jul 21 13:34:59 2012 88.97% done, estimate finish Sat Jul 21 13:34:59 2012 89.07% done, estimate finish Sat Jul 21 13:34:59 2012 89.16% done, estimate finish Sat Jul 21 13:34:59 2012 89.26% done, estimate finish Sat Jul 21 13:34:59 2012 89.36% done, estimate finish Sat Jul 21 13:34:59 2012 89.45% done, estimate finish Sat Jul 21 13:35:00 2012 89.55% done, estimate finish Sat Jul 21 13:35:00 2012 89.64% done, estimate finish Sat Jul 21 13:35:00 2012 89.74% done, estimate finish Sat Jul 21 13:35:00 2012 89.84% done, estimate finish Sat Jul 21 13:35:00 2012 89.93% done, estimate finish Sat Jul 21 13:35:00 2012 90.03% done, estimate finish Sat Jul 21 13:35:00 2012 90.12% done, estimate finish Sat Jul 21 13:35:00 2012 90.22% done, estimate finish Sat Jul 21 13:35:01 2012 90.31% done, estimate finish Sat Jul 21 13:35:01 2012 90.41% done, estimate finish Sat Jul 21 13:35:01 2012 90.50% done, estimate finish Sat Jul 21 13:35:01 2012 90.60% done, estimate finish Sat Jul 21 13:35:01 2012 90.70% done, estimate finish Sat Jul 21 13:35:01 2012 90.79% done, estimate finish Sat Jul 21 13:35:01 2012 90.89% done, estimate finish Sat Jul 21 13:35:01 2012 90.99% done, estimate finish Sat Jul 21 13:35:01 2012 91.08% done, estimate finish Sat Jul 21 13:35:01 2012 91.17% done, estimate finish Sat Jul 21 13:35:01 2012 91.27% done, estimate finish Sat Jul 21 13:35:02 2012 91.37% done, estimate finish Sat Jul 21 13:35:02 2012 91.46% done, estimate finish Sat Jul 21 13:35:02 2012 91.56% done, estimate finish Sat Jul 21 13:35:02 2012 91.65% done, estimate finish Sat Jul 21 13:35:02 2012 91.75% done, estimate finish Sat Jul 21 13:35:02 2012 91.85% done, estimate finish Sat Jul 21 13:35:02 2012 91.94% done, estimate finish Sat Jul 21 13:35:02 2012 92.04% done, estimate finish Sat Jul 21 13:35:02 2012 92.13% done, estimate finish Sat Jul 21 13:35:02 2012 92.23% done, estimate finish Sat Jul 21 13:35:02 2012 92.32% done, estimate finish Sat Jul 21 13:35:02 2012 92.42% done, estimate finish Sat Jul 21 13:35:03 2012 92.52% done, estimate finish Sat Jul 21 13:35:03 2012 92.61% done, estimate finish Sat Jul 21 13:35:03 2012 92.71% done, estimate finish Sat Jul 21 13:35:03 2012 92.80% done, estimate finish Sat Jul 21 13:35:03 2012 92.90% done, estimate finish Sat Jul 21 13:35:03 2012 92.99% done, estimate finish Sat Jul 21 13:35:03 2012 93.09% done, estimate finish Sat Jul 21 13:35:03 2012 93.19% done, estimate finish Sat Jul 21 13:35:03 2012 93.28% done, estimate finish Sat Jul 21 13:35:03 2012 93.38% done, estimate finish Sat Jul 21 13:35:03 2012 93.47% done, estimate finish Sat Jul 21 13:35:03 2012 93.57% done, estimate finish Sat Jul 21 13:35:04 2012 93.66% done, estimate finish Sat Jul 21 13:35:04 2012 93.76% done, estimate finish Sat Jul 21 13:35:04 2012 93.86% done, estimate finish Sat Jul 21 13:35:04 2012 93.95% done, estimate finish Sat Jul 21 13:35:04 2012 94.05% done, estimate finish Sat Jul 21 13:35:04 2012 94.14% done, estimate finish Sat Jul 21 13:35:03 2012 94.24% done, estimate finish Sat Jul 21 13:35:03 2012 94.34% done, estimate finish Sat Jul 21 13:35:03 2012 94.43% done, estimate finish Sat Jul 21 13:35:03 2012 94.53% done, estimate finish Sat Jul 21 13:35:03 2012 94.62% done, estimate finish Sat Jul 21 13:35:03 2012 94.72% done, estimate finish Sat Jul 21 13:35:04 2012 94.81% done, estimate finish Sat Jul 21 13:35:04 2012 94.91% done, estimate finish Sat Jul 21 13:35:04 2012 95.01% done, estimate finish Sat Jul 21 13:35:04 2012 95.10% done, estimate finish Sat Jul 21 13:35:04 2012 95.20% done, estimate finish Sat Jul 21 13:35:04 2012 95.29% done, estimate finish Sat Jul 21 13:35:04 2012 95.39% done, estimate finish Sat Jul 21 13:35:04 2012 95.49% done, estimate finish Sat Jul 21 13:35:04 2012 95.58% done, estimate finish Sat Jul 21 13:35:04 2012 95.68% done, estimate finish Sat Jul 21 13:35:04 2012 95.77% done, estimate finish Sat Jul 21 13:35:05 2012 95.87% done, estimate finish Sat Jul 21 13:35:05 2012 95.96% done, estimate finish Sat Jul 21 13:35:05 2012 96.06% done, estimate finish Sat Jul 21 13:35:05 2012 96.16% done, estimate finish Sat Jul 21 13:35:05 2012 96.25% done, estimate finish Sat Jul 21 13:35:05 2012 96.35% done, estimate finish Sat Jul 21 13:35:05 2012 96.44% done, estimate finish Sat Jul 21 13:35:05 2012 96.54% done, estimate finish Sat Jul 21 13:35:05 2012 96.63% done, estimate finish Sat Jul 21 13:35:05 2012 96.73% done, estimate finish Sat Jul 21 13:35:05 2012 96.83% done, estimate finish Sat Jul 21 13:35:05 2012 96.92% done, estimate finish Sat Jul 21 13:35:06 2012 97.02% done, estimate finish Sat Jul 21 13:35:06 2012 97.11% done, estimate finish Sat Jul 21 13:35:06 2012 97.21% done, estimate finish Sat Jul 21 13:35:06 2012 97.31% done, estimate finish Sat Jul 21 13:35:06 2012 97.40% done, estimate finish Sat Jul 21 13:35:06 2012 97.50% done, estimate finish Sat Jul 21 13:35:06 2012 97.59% done, estimate finish Sat Jul 21 13:35:06 2012 97.69% done, estimate finish Sat Jul 21 13:35:06 2012 97.78% done, estimate finish Sat Jul 21 13:35:06 2012 97.88% done, estimate finish Sat Jul 21 13:35:06 2012 97.98% done, estimate finish Sat Jul 21 13:35:06 2012 98.07% done, estimate finish Sat Jul 21 13:35:07 2012 98.17% done, estimate finish Sat Jul 21 13:35:07 2012 98.26% done, estimate finish Sat Jul 21 13:35:07 2012 98.36% done, estimate finish Sat Jul 21 13:35:07 2012 98.45% done, estimate finish Sat Jul 21 13:35:07 2012 98.55% done, estimate finish Sat Jul 21 13:35:07 2012 98.64% done, estimate finish Sat Jul 21 13:35:07 2012 98.74% done, estimate finish Sat Jul 21 13:35:07 2012 98.84% done, estimate finish Sat Jul 21 13:35:07 2012 98.93% done, estimate finish Sat Jul 21 13:35:07 2012 99.03% done, estimate finish Sat Jul 21 13:35:07 2012 99.12% done, estimate finish Sat Jul 21 13:35:07 2012 99.22% done, estimate finish Sat Jul 21 13:35:08 2012 99.32% done, estimate finish Sat Jul 21 13:35:08 2012 99.41% done, estimate finish Sat Jul 21 13:35:08 2012 99.51% done, estimate finish Sat Jul 21 13:35:08 2012 99.60% done, estimate finish Sat Jul 21 13:35:08 2012 99.70% done, estimate finish Sat Jul 21 13:35:08 2012 99.79% done, estimate finish Sat Jul 21 13:35:08 2012 99.89% done, estimate finish Sat Jul 21 13:35:08 2012 Total translation table size: 0 Total rockridge attributes bytes: 10977 Total directory bytes: 21084 Path table size(bytes): 58 Max brk space used 0 117615 extents written (229 MB) mkisofs calculate size command: ----------------------- /usr/bin/mkisofs -cdrecord-params 16,404464 -prev-session /dev/sr0 -gui -graft-points -print-size -quiet -volid 20120526 -volset -appid K3B THE CD KREATOR (C) 1998-2010 SEBASTIAN TRUEG AND MICHAL MALEK -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/kde-rglennJAV8I7/k3bDs3461.tmp -rational-rock -hide-list /tmp/kde-rglennJAV8I7/k3bSm3461.tmp -joliet -joliet-long -hide-joliet-list /tmp/kde-rglennJAV8I7/k3bjG3461.tmp -no-cache-inodes -udf -full-iso9660-filenames -iso-level 3 -path-list /tmp/kde-rglennJAV8I7/k3bnt3461.tmp mkisofs command: ----------------------- /usr/bin/mkisofs -cdrecord-params 16,404464 -prev-session /dev/sr0 -gui -graft-points -volid 20120526 -volset -appid K3B THE CD KREATOR (C) 1998-2010 SEBASTIAN TRUEG AND MICHAL MALEK -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/kde-rglennJAV8I7/k3bxL3461.tmp -rational-rock -hide-list /tmp/kde-rglennJAV8I7/k3bxv3461.tmp -joliet -joliet-long -hide-joliet-list /tmp/kde-rglennJAV8I7/k3bWl3461.tmp -no-cache-inodes -udf -full-iso9660-filenames -iso-level 3 -path-list /tmp/kde-rglennJAV8I7/k3brA3461.tmp