When moving ticket to other milestone, position is wrong
Bug #439948 reported by
Knut Eldhuset
This bug affects 1 person
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
trac-backlog |
Invalid
|
Undecided
|
Unassigned |
Bug Description
When moving a ticket to another milestone, it's position is the same as it had in the milestone it came from. I think it should be put at the bottom of the milestone it is moved to. You probably want to place it manually anyway, and that is easier if the ticket is appearing in some deterministic location.
I am using version 0.2.1.
Changed in trac-backlog: | |
status: | New → Triaged |
To post a comment you must log in.
This is actually a feature. The idea behind maintaining a backlog to organize the tickets absolutely in the unscheduled backlog, and then bring them into your sprint. It maintains the ordering that you and your team decided on. It also allows you to move the ticket back out of the sprint, and still retain the ordering your team had decided on.
FWIW, several commercial apps that do this sort of thing behave exactly the same way. For example, the GreenHopper plugin for Jira has this behavior.