Heat creates temporary projects which interfere with the shared quota calculation

Bug #1659246 reported by Lisa Zangrando
6
This bug affects 1 person
Affects Status Importance Assigned to Milestone
Synergy Scheduler Manager
Fix Released
Low
Lisa Zangrando

Bug Description

Heat creates temporary projects into the "heat" domain. Such projects interfere with the shared quota calculation. Therefore Synergy must omit them from the list of projects used for calculating the shared quota.

summary: - Heat creates temporary projects which interfere with the fair-share
+ Heat creates temporary projects which interfere with the shared quota
calculation
Revision history for this message
Lisa Zangrando (lisa-zangrando) wrote :

Fix #425136

Changed in synergy-scheduler-manager:
assignee: nobody → Lisa Zangrando (lisa-zangrando)
importance: Undecided → Low
status: New → Fix Committed
Changed in synergy-scheduler-manager:
milestone: none → 2.3.0
Changed in synergy-scheduler-manager:
status: Fix Committed → Fix Released
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.