Provide a message to the operator that sync cmd needs to be executed after certain operations
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
StarlingX |
Fix Released
|
Low
|
Li Zhu |
Bug Description
Brief Description
-----------------
The sync command must be executed by the operator after any of the following operations:
Add one or more subclouds to the SPG.
Remove one or more subclouds from the SPG.
Update one or more subclouds in the SPG.
Please consider outputting an informative message as an enhancement request after those operations, informing the operator that a sync command should be executed. Something like:
The operation has caused the SPG to be out-of-sync. Please consider running the sync command to push the subcloud peer group changes to the peer site:
$ dcmanager peer-group-
Severity
--------
Minor
Steps to Reproduce
------------------
Add, Remove, or Update a subcloud in the SPG.
Expected Behavior
------------------
An informative message informing the operator to run sync command.
Actual Behavior
----------------
No informative message is displayed.
Reproducibility
---------------
100%
System Configuration
-------
Distributed Cloud
Branch/Pull Time/Commit
-------
22.12 MR3
Last Pass
---------
New test scenario
Timestamp/Logs
--------------
NA
Test Activity
-------------
Feature Testing
Workaround
-----------
Read the customer doc
Changed in starlingx: | |
importance: | Undecided → Low |
tags: | added: stx.10.0 stx.distcloud |
Changed in starlingx: | |
assignee: | nobody → Li Zhu (lzhu1) |
Fix proposed to branch: master /review. opendev. org/c/starlingx /distcloud/ +/909277
Review: https:/