After upgrade controlller-1 failed to unlock unexpected argument 'first_report'
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
StarlingX |
New
|
Undecided
|
Unassigned |
Bug Description
Brief Description
-----------------
After the controller-1 upgrade controller-1 unlock was failed with error "Can not unlock host controller-1 that has not yet been inventoried. Please wait for host to complete initial inventory prior to unlock.
Severity
--------
Critical
Steps to Reproduce
------------------
1. Install DX stx 6.0
2. Follow the upgrade procedure to upgrade.
Expected Behavior
------------------
There is no unlock failure after Controller-1 upgrade
Actual Behavior
----------------
"Can not unlock host controller-1 that has not yet been inventoried. Please wait for host to complete initial inventory prior to unlock."
Reproducibility
---------------
Reproducible/
System Configuration
-------
Two node system, Multi-node system, Dedicated storage
Branch/Pull Time/Commit
-------
Last Pass
---------
Did this test scenario pass previously? If so, please indicate the load/pull time info of the last pass.
Use this section to also indicate if this is a new test scenario.
Timestamp/Logs
--------------
sysinv 2023-09-28 15:25:35.500 105887 ERROR sysinv.
2023-09-28 15:25:35.500 105887 ERROR sysinv.
2023-09-28 15:25:35.500 105887 ERROR sysinv.
2023-09-28 15:25:35.500 105887 ERROR sysinv.
2023-09-28 15:25:35.500 105887 ERROR sysinv.
2023-09-28 15:25:35.500 105887 ERROR sysinv.
2023-09-28 15:25:35.500 105887 ERROR sysinv.
2023-09-28 15:25:35.500 105887 ERROR sysinv.
sysinv 2023-09-28 15:25:35.501 105887 ERROR sysinv.
Test Activity
-------------
Regression
Workaround
----------