Upgrade activation interrupted by host-swact
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
StarlingX |
Fix Released
|
Medium
|
David Sullivan |
Bug Description
Brief Description
-----------------
During an upgrade-activate there are long running tasks. If a host-swact is issued during the activate these tasks are interrupted and the upgrade can not continue.
Severity
--------
Major
Steps to Reproduce
------------------
upgrade all hosts to the new release
issue the upgrade-activate
issue host-swact
Expected Behavior
------------------
The upgrade continues
Actual Behavior
----------------
Any upgrade task running is killed on the active controller before the swact. The upgrade can not be recovered.
Reproducibility
---------------
Reproducible
System Configuration
-------
Multi-node system
Branch/Pull Time/Commit
-------
20210302T053000Z
Last Pass
---------
NA
Timestamp/Logs
--------------
NA
Test Activity
-------------
Feature Testing
Workaround
----------
Edit the sysinv database to reset the upgrade-state. Rerun the upgrade-activate command.
Changed in starlingx: | |
assignee: | nobody → David Sullivan (dsullivanwr) |
stx.5.0 / medium - related to the upgrades framework