Rotating Schedules With Different Schedules Per Day Stop a 5 Days
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
SchoolTool |
Fix Released
|
Critical
|
Justas Sadzevičius |
Bug Description
Hello,
I have looked through the Schooltool book and searched the questions section of Launchpad and don't seem to find anything relating to this specific issue:
Have set up a new school year and term. Am now trying to set up a timetable. The timetable that needs to be set up is based on an 8 day cycle with different times each day set on days of the week.
The days are set up named day 1 . . . etc. The times for classes are set up in 24 hr format as required and are complete for the days of the week.
When the wizard is finished, the first five days of the cycle are populated with times, but the last 3 days are left empty. Have gone through the set up wizard a number of times with the same results. There don't seem to be any logical alternatives to the way I have set it up. Am I overlooking something?
My system is:
Schooltool 2.0
Ubuntu 11.10 (yes I know its old. . .)
virtualized in virtualbox 4.0
Our school changed over from a 2 week cycle which worked fine.
Any assistance is appreciated.
Thank you,
Bill
Related branches
Changed in schooltool: | |
status: | Triaged → Fix Committed |
Changed in schooltool: | |
milestone: | none → 2.5.2 |
Changed in schooltool: | |
status: | Fix Committed → Fix Released |
no longer affects: | schooltool/trunk |
no longer affects: | schooltool/flourish |
no longer affects: | schooltool/trunk |
no longer affects: | schooltool/flourish |