Dynamic braking issues (1.1.1.3487, ProTrain Rheintal, Special train along the Rhine-valley-tr)
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
Open Rails |
New
|
Undecided
|
Unassigned |
Bug Description
Open Rails ver 1.1.1.3487. Dynamic brakes:
Electric locomotive DB 103 and ICE 3 dynamics engage with application of air brake, then fail to disengage. Sometimes initializing brakes (key=?) releases dynamics, sometimes not. Sometimes a repeated push on the ';' turns it off, sometimes not. Passenger unloading does not start until dynamics release even though the train is fully stopped.
Combined throttle loco: dynamic brake lever positions not synchronized correctly with status display. On engagement display shows IDLE, then notch -1 shows "SETUP", notch -2 shows B1 and so on. Degree of reduction may be uneven. When reducing, notch -1= SETUP, notch 0 = IDLE, then notch +1 = IDLE. Very distracting.
summary: |
- Dynamic braking issues + Dynamic braking issues (1.1.1.3487, ProTrain Rheintal, Special train + along the Rhine-valley-tr) |
Routes tested were ProTrain Rheintal and 3DTS Tehachapi II.