Closing a nonconformity even if an action is not done

Bug #1219854 reported by Maxime Chambreuil (http://www.savoirfairelinux.com)
16
This bug affects 3 people
Affects Status Importance Assigned to Milestone
OpenERP Management System
Fix Released
Wishlist
Sandy Carter (http://www.savoirfairelinux.com)

Bug Description

I can close a non-conformity even if one of the actions are still marked as non-finished.

Closing an NC should check the states of all the related actions and pop-up a message if one of them is not done.

Related branches

Changed in openerp-mgmtsystem:
status: New → Triaged
importance: Undecided → Medium
assignee: nobody → Sandy Carter (http://www.savoirfairelinux.com) (sandy-carter)
Revision history for this message
Daniel Reis (dreis-pt) wrote :

IMHO Importance should be "Wishlist".

Changed in openerp-mgmtsystem:
importance: Medium → Wishlist
Revision history for this message
Sandy Carter (http://www.savoirfairelinux.com) (sandy-carter) wrote :

Do we want the message to block closing the action, or do we just want a warning with the ability to cancel?

Revision history for this message
Daniel Reis (dreis-pt) wrote :

I'm in favour for a blocking error message.
The warning/cancel option you would need a "wizard", and I think it's too much trouble.

Revision history for this message
Maxime Chambreuil (http://www.savoirfairelinux.com) (max3903) wrote :

We want a message to block closing the NC.

Changed in openerp-mgmtsystem:
status: Triaged → In Progress
Changed in openerp-mgmtsystem:
status: In Progress → Fix Committed
Changed in openerp-mgmtsystem:
status: Fix Committed → Fix Released
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Related questions

Remote bug watches

Bug watches keep track of this bug in other bug trackers.