After applying "Power off" action in nodes listing, the power doesn't update unless it is manually queried

Bug #1727900 reported by Newell Jensen on 2017-10-27
10
This bug affects 2 people
Affects Status Importance Assigned to Milestone
MAAS
Wishlist
Unassigned

Bug Description

After applying "Power off" action in nodes listing, the power doesn't update unless it is manually queried. We should be performing a power query action after powering machines off and this should be updated in the UI.

Changed in maas:
milestone: next → 2.3.0
Blake Rouse (blake-rouse) wrote :

The power action should be reporting the final state of the power action. This is either the specific power driver doing the wrong thing or the whole RPC of performing power actions is wrong.

Changed in maas:
status: Confirmed → Incomplete
Changed in maas:
milestone: 2.3.0 → 2.3.x
Changed in maas:
milestone: 2.3.x → 2.4.x
Robert Varjasi (robert.varjasi) wrote :

We noticed quite the same with MAAS v2.4.2 (2.4.2-7034-g2f5deb8b8-0ubuntu1). After failed commissioning the power OFF action sent to the node by MAAS automatically but MAAS was still showing these machines in power ON state. After manual power state check, MAAS updated the node status to power OFF.

To post a comment you must log in.
This report contains Public information  Edit
Everyone can see this information.

Other bug subscribers