Feature request: modify layer's start/end times instead of replacing layer

Bug #1198498 reported by Derek Lamb
6
This bug affects 1 person
Affects Status Importance Assigned to Milestone
JHelioviewer
New
Undecided
Unassigned

Bug Description

Often I am looking at an event, and realize that the time frame I put in initially was too short, and I want some time before and/or afterwards for more context. As best as I have been able to figure, the current way to do that is to delete the existing layer and add a new layer with a broader time range. Thus the old data has to be downloaded all over again., plus the new data. Would it be possible to right click (or on Mac two-finger-click) and have the menu include "Modify Layer" or "Extend Time Range" or "Change Start/End Time" with the option to prepend or append data of the same type at the same cadence as the original?

To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.