Pen/pencil: nodes from different subpaths can't be connected

Bug #168155 reported by dcberg
10
This bug affects 1 person
Affects Status Importance Assigned to Milestone
Inkscape
Invalid
Low
Unassigned

Bug Description

Draw two paths with a pen
Combine them
Use the freehand or bezier tool to connect the ends of the different
paths.

Expected: The nodes of the ends are highlighted when coming close and one
gets only one node, if one stops when highlighted.

Actual: Works with the starting node, but not the end node of the line
you're drawing to conntect the two lines.

Revision history for this message
Bryce Harrington (bryce) wrote :

Originator: NO

Confirmed on Gentoo Linux. The first node gets connected, the second does
not.

This is in contrast to what happens when you do the following: Draw a 'C'
shaped line using the pen. Now draw a line connecting the two endpoints of
the 'C'. Resultant path is a complete connected path as expected, with
three nodes.

Revision history for this message
John Cliff (johncliff) wrote :

Confirmed in SVN.

Changed in inkscape:
status: New → Confirmed
su_v (suv-lp)
tags: added: node-editing
Revision history for this message
Brynn (brynn4inks-deactivatedaccount) wrote :

Hello,
I just wanted to add my experience. I recently reported this at InkscapeForum.com (http://www.inkscapeforum.com/viewtopic.php?f=5&t=7453), where ~suv informed me that it is a bug. (And I see that it is rather an old one :-( )

I'm using Inkscape 0.48 stable release on Windows 7, 64-bit.

I think subpaths of the same compound path should be able to be connected, to form one single path.

Thank you very much :-)
Brynn

Revision history for this message
Brynn (brynn4inks-deactivatedaccount) wrote :

Darn, I wish comments could be editted.

I meant:
I think subpaths of the same compound path should be able to be connected, to form one single path, with the pen or pencil tool.

su_v (suv-lp)
tags: added: freehand pen
removed: node-editing
Revision history for this message
Beluga (buovjaga) wrote :

Repro. Same result with start and end nodes. They are not really connected, but can be pulled away.

Arch Linux 64-bit, KDE Plasma 5
Inkscape 0.92pre1 15073 (GTK3)

tags: added: bug-migration
Revision history for this message
Brynn (brynn4inks-deactivatedaccount) wrote :

I've been focusing on migrating only the bugs I've reported myself. But I found this in my profile (I guess because I replied to it) and decided it's simple enough that I can migrate it. Plus being so old, I wanted to make sure it gets migrated.

I tested on 1.0 alpha, and can still reproduce it.

Moved to: https://gitlab.com/inkscape/inbox/issues/686

Closed by https://gitlab.com/brynn

Changed in inkscape:
status: Confirmed → Invalid
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.