Add an integration test for switching between 2 projects of one user

Bug #1496063 reported by Timur Sufiev on 2015-09-15
6
This bug affects 1 person
Affects Status Importance Assigned to Milestone
OpenStack Dashboard (Horizon)
Wishlist
Tatyana Kuterina

Bug Description

The bug 1450963 would have been caught earlier, if we had an integration test which switched 2 projects for one user and checked for absence of error messages.

Timur Sufiev (tsufiev-x) on 2015-09-15
tags: added: integration-tests
Changed in horizon:
importance: Undecided → Wishlist
Timur Sufiev (tsufiev-x) wrote :
Matthias Runge (mrunge) on 2015-11-24
Changed in horizon:
status: New → Triaged
Changed in horizon:
assignee: nobody → Timur Sufiev (tsufiev-x)
status: Triaged → In Progress
Changed in horizon:
assignee: Timur Sufiev (tsufiev-x) → Ekaterina Shutova (eshutova)
Changed in horizon:
assignee: Ekaterina Shutova (eshutova) → Tatyana Kuterina (tkuterina)
Changed in horizon:
assignee: Tatyana Kuterina (tkuterina) → Ekaterina Shutova (eshutova)
Changed in horizon:
assignee: Ekaterina Shutova (eshutova) → Tatyana Kuterina (tkuterina)

Change abandoned by David Lyle (<email address hidden>) on branch: master
Review: https://review.openstack.org/269703
Reason: This review is > 4 weeks without comment, and failed Jenkins the last time it was checked. We are abandoning this for now. Feel free to reactivate the review by pressing the restore button and leaving a 'recheck' comment to get fresh test results.

Gary W. Smith (gary-w-smith) wrote :

Integration tests have been abandoned all together by Horizon. This no longer applies.

Changed in horizon:
status: In Progress → Won't Fix
To post a comment you must log in.
This report contains Public information  Edit
Everyone can see this information.

Other bug subscribers