In Kirk, selected one test (I think it was WBC label and its result 9.5) and then selected Actions and Review and Sign and despite that I had selected only the one test, the three tests that appeared above it (CRP, RBC) as well as the WBC were included in the scope. The action is applied to all three.
Likewise, when I next used the button "Select" to select All unsigned, only the single remaining unsigned entity (PLT) was highlighted in blue, but when I went to Review and Sign the dialog display included in the scope all four items, i.e. included the three that had already been signed. The action was applied to all four items.
Also I note the sort order (order of presentation down the column) does not match the sequence within the dialog. Is there control over this and what is the preferred order and the reasoning is different between the two?
1) I cannot reproduce the first problem.
2) However, the second problem I can reproduce. I am looking into this at the moment.
3) There currently isn't any order applied.