MOS Job master.staging.centos.bvt_1 failed with the traceback for master branch
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
Fuel for OpenStack |
Won't Fix
|
Critical
|
Matthew Mosesohn | ||
6.0.x |
Won't Fix
|
Undecided
|
Matthew Mosesohn |
Bug Description
The reason of this fail in the following: the deployment of Fuel master node hangs on step with pre-configuration (please see attached screenshot) - and in the result all automated tests/scripts will fail because they can't automatically continue the deployment of Fuel master node.
need to change this behaviour and allow full automated deployment of Fuel node.
Traceback:
2015-01-26 15:27:56,987 - INFO environment.py:585 -- Puppet timeout set in 6000.0
ERROR
Prepare master node ... SKIP: Failure in <function setup_master at 0x7ff4927d97d0>
Bootstrap 5 slave nodes ... SKIP: Failure in <function setup_master at 0x7ff4927d97d0>
Deploy cluster in HA mode with Neutron VLAN ... SKIP: Failure in <function setup_master at 0x7ff4927d97d0>
=======
ERROR: Create environment and set up master node
-------
Traceback (most recent call last):
File "/usr/lib/
compatabili
File "/usr/lib/
func()
File "/usr/lib/
func(
File "/home/
self.
File "/home/
self.
File "/home/
raise Exception('Fuel node deployment failed.')
Exception: Fuel node deployment failed.
Changed in fuel: | |
assignee: | Fuel Core Team (fuel-core) → Fuel Library Team (fuel-library) |
Changed in fuel: | |
assignee: | Fuel Library Team (fuel-library) → Fuel DevOps (fuel-devops) |
milestone: | 7.0 → 6.1 |
Changed in fuel: | |
status: | Confirmed → In Progress |
Changed in fuel: | |
status: | In Progress → New |
Changed in fuel: | |
assignee: | Fuel Library Team (fuel-library) → Matthew Mosesohn (raytrac3r) |
Changed in fuel: | |
status: | New → In Progress |
Changed in fuel: | |
status: | Incomplete → Won't Fix |
The other job: jenkins- product. srt.mirantis. net:8080/ view/Staging% 20Mirrors/ job/master. staging. ubuntu. bvt_2/54/ console
http://
failed with the same error.