Hours of Operation Buttons Need Better Positioning

Bug #2039759 reported by Jennifer Pringle
10
This bug affects 2 people
Affects Status Importance Assigned to Milestone
Evergreen
Confirmed
Low
Unassigned

Bug Description

Evergreen 3.11

On the Hours of Operation tab (Administration -> Server Administration -> Organizational Units) the "Clear Hours of Operation" and "Apply Changes" buttons are oddly stacked on top of each other instead of side by side as they were in 3.9

summary: - Hours of Operation Buttons Need Better Postitioning
+ Hours of Operation Buttons Need Better Positioning
Changed in evergreen:
status: New → Confirmed
Gina Monti (gmonti90)
Changed in evergreen:
assignee: nobody → Gina Monti (gmonti90)
Revision history for this message
Gina Monti (gmonti90) wrote :
Revision history for this message
Gina Monti (gmonti90) wrote :

New screen

tags: added: pullrequest
Galen Charlton (gmc)
Changed in evergreen:
assignee: Gina Monti (gmonti90) → nobody
importance: Undecided → Low
Revision history for this message
Susan Morrison (smorrison425) wrote :

The spacing between the buttons looks better, but I think the intent was to have the buttons side by side as in earlier versions instead of stacked on top of each other (screenshot attached). If the stacked formatting is preferred, happy to sign off.

Revision history for this message
Terran McCanna (tmccanna) wrote :

I also agree that side-by-side would work better.

tags: added: needswork
removed: pullrequest
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.