VMAX Driver - A failed manage operation can lead to subsequent manage operations on the same volume to fail
Bug #1792884 reported by
Kumar Prashant
This bug affects 1 person
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
Cinder |
Fix Released
|
Undecided
|
Kumar Prashant |
Bug Description
A failed manage existing operation using the VMAX driver can cause future manage operations to fail if the failure happened after the volume was renamed on the VMAX array. This is because of rollback to rename the volume back to it's original name
Changed in cinder: | |
assignee: | nobody → Kumar Prashant (prashk) |
To post a comment you must log in.
Fix proposed to branch: master /review. openstack. org/603202
Review: https:/