Attachments should be linked to results rather than tests

Bug #386545 reported by Marc Tardif
8
This bug affects 1 person
Affects Status Importance Assigned to Milestone
Checkbox
Fix Released
High
Marc Tardif

Bug Description

Currently, attachments are linked to tests upon reporting. The problem is that the information gathered by the attachment files or commands might've changed in the meanwhile. For example, if a suite of tests consistently overwrites the same logfile, then the attachments would all contain the same information since they would be gathered upon reporting. Instead, attachments should be linked to results immediately after the test is performed.

Marc Tardif (cr3)
Changed in checkbox:
assignee: nobody → Marc Tardif (cr3)
importance: Undecided → High
milestone: none → 0.8-alpha3
status: New → Confirmed
Marc Tardif (cr3)
Changed in checkbox:
status: Confirmed → Fix Released
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.