Calibre - "Job" status window needs a date/time stamp
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
calibre |
Fix Released
|
Undecided
|
Unassigned |
Bug Description
**This is an extra feature request, not a bug report**
Calibre - "Job" status window needs a date/time stamp associated with each line item, in addition to the running time, so folks can track which jobs ran when.
Scenario:
1. Start Calibre
2. Select the drop down next to the big "Fetch News" icon in the ribbon/tool bar at the top of the main calibre window
3. "Download All Scheduled..."
4. Click on the "Jobs:" link at the bottom right of the main calibre window
5. The resulting Job status window shows the following columns:
Job | Status | Progress | Running Time
Result:
After running these operations for several times/days/weeks, It is difficult to distinguish which job ran and succeeded/failed at which point in time.
Request:
We should add another column with the date/time stamp of the result of the operation on each line item.
Thanks!
Version: 0.9.12
O/S: Win8 (64 bit)
Fixed in branch master. The fix will be in the next release. calibre is usually released every Friday.
status fixreleased