'bzr status' should show the current thread

Bug #232465 reported by Jonathan Lange
2
Affects Status Importance Assigned to Milestone
Loom
Fix Released
Medium
Jonathan Lange

Bug Description

The current thread is integral to the status of the working tree when you are working in a Loom.

The first line of 'bzr status' should indicate which thread the loom is in.

Related branches

Revision history for this message
Jonathan Lange (jml) wrote :

A fix for this landed in r83.

Changed in bzr-loom:
assignee: nobody → jml
importance: Undecided → Medium
status: New → Fix Released
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.