View Access Dates Changing
Bug #564001 reported by
Jesse Friedman @ UCSF
This bug affects 2 people
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
Mahara |
Invalid
|
Low
|
Unassigned | ||
1.2 |
Invalid
|
Low
|
Unassigned |
Bug Description
After assigning start and stop dates in the View Access page and saving, the dates will automatically change. We've continually had it change the start date to date in 2018, and the end date to date in 2001. This results in the view share failing every time a student uses the date field.
Mahara version 1.2.3 (2009111010)
Platform: VMWare ESX Server 3.5 running
Operating System: Red Hat Linux 5.1
Database Info: PostgreSQL 8.1.11
Changed in mahara: | |
status: | New → Fix Committed |
milestone: | none → 1.3.0 |
Changed in mahara: | |
status: | Fix Committed → Invalid |
To post a comment you must log in.
Hi, Not sure if I understood correctly. If the end date in the view access is before the start one, it should not let you to save it at all and it does not change the date you had entered.