[lunar, ppc64el] failing serviceability/attach/AttachNegativePidTest.java
Bug #2037587 reported by
Vladimir Petko
This bug affects 1 person
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
openjdk-21 (Ubuntu) |
Invalid
|
Undecided
|
Unassigned |
Bug Description
During build for lunar[1], serviceability/
The test log is attached.
The test failed with `result: Failed. Execution failed: `main' threw exception: java.lang.
Note: a lot of other tests should've failed if it was the case.
To post a comment you must log in.
make TEST=serviceabi lity/attach/ AttachNegativeP idTest. java JTREG_REPEAT_ COUNT=1000 test
======= ======= ======= ======= == ======= ======= ======= == test/hotspot/ jtreg/serviceab ility/attach/ AttachNegativeP idTest. java
1 1 0 0 ======= ======= ======= ==
Test summary
=======
TEST TOTAL PASS FAIL ERROR
jtreg:
=======
TEST SUCCESS
Finished building target 'test' in configuration 'linux- ppc64le- server- release'
The test passes in ppc64el vm.
Marking as invalid - CI VM issue.