Reselect advanced schedule on modify task

Bug #2017015 reported by Richard Muvirimi
6
This bug affects 1 person
Affects Status Importance Assigned to Milestone
Zeit
New
Undecided
Unassigned

Bug Description

When modifying an existing task with a schedule that's not one of the preset schedules, the app currently defaults to the Basic schedule. This can result in a different schedule being selected if the user doesn't notice the change. This was a noticeable issue when one wanted to just change a minor detail of the task such as the description or command but would then be required to select Advanced schedule or they would have to redo the scheduling part. With this pull request, the app will first check if the existing schedule is one of the preset schedules. If it is, that schedule will be selected by default. Otherwise, the app will default to the Advanced schedule.

I have made a pull request on GitHub addressing this.

To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.