Multiple NODE_FAILURE on all jobs running on rdoproject.org tenant

Bug #1986502 reported by chandan kumar
6
This bug affects 1 person
Affects Status Importance Assigned to Milestone
tripleo
Fix Released
Critical
Unassigned

Bug Description

Almost all the centos stream 9 and 8 jobs running on vexxhost cloud are hitting node_failure.
It impacted RDO third party check jobs, master and wallaby integration/component lines.
Most of them are cs9 based jobs.

Based on https://review.rdoproject.org/zuul/builds?result=NODE_FAILURE&skip=0 result page.

Based on https://review.rdoproject.org/zuul/builds?job_name=periodic-tripleo-centos-9-wallaby-promote-promoted-components-to-tripleo-ci-testing and https://review.rdoproject.org/zuul/build/6943583d6a5548098448393a33702224

periodic-tripleo-centos-9-wallaby-promote-promoted-components-to-tripleo-ci-testing NODE_FAILURE started at 2022-08-13 21:11:15 UTC.

and last one while filling this bug:
tripleo-ci-centos-9-ovb-1ctlr_1comp-featureset001 - 2022-08-15 06:23:57 UTC
- https://review.rdoproject.org/zuul/build/271a4c0e1eef415494bc979c372c0258

It might be happening from very long time.
It is a tracker bug for the same.

Thank you Marios for adding more details in https://bugs.launchpad.net/tripleo/+bug/1986502/comments/2 .

Revision history for this message
chandan kumar (chkumar246) wrote :
description: updated
Revision history for this message
Marios Andreou (marios-b) wrote :

the latest buildsets from the main lines master/wallaby/train are all from before the weekend:

master [1] wallaby/9 [2] train [3]

So this bug is blocking all lines. The promote to tripleo-ci-testing jobs are hitting this bug e.g. see [4] and attached screenshot here so none of the jobs can run without a new tripleo-ci-testing

[1] https://review.rdoproject.org/zuul/buildset/953eacd0246648ada324268a4c21a8e6
[2] https://review.rdoproject.org/zuul/buildset/41e058e884fc4e35bfe4bd19d8471411
[3] https://review.rdoproject.org/zuul/buildset/0a685aa16ac04f0eb43c04c925bfd36b
[4] https://review.rdoproject.org/zuul/builds?job_name=periodic-tripleo-centos-9-wallaby-promote-promoted-components-to-tripleo-ci-testing

description: updated
Revision history for this message
Sandeep Yadav (sandeepyadav93) wrote :

Issue resolved after changing OS_AUTHURL.

Changed in tripleo:
status: Triaged → Fix Released
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.