Swarm test Project 9.0.system_test.ubuntu.ironic_deploy_swift triggers to an error
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
Mirantis OpenStack |
Fix Released
|
High
|
MOS Ironic |
Bug Description
Detailed bug description:
ISO: http://
Configuration:
1 node with controller role
2 node with controller+ironic role
1 node with compute role
1 nodes with ironic role
Steps to reproduce:
Deploy ironic with 1 baremetal node
Scenario:
1. Create cluster
2. Add 1 node with controller role
3. Add 2 node with controller+ironic role
4. Add 1 node with compute role
5. Add 1 nodes with ironic role
6. Deploy the cluster
7. Upload image to glance
8. Enroll Ironic nodes
9. Boot nova instance
10. Check Nova instance status
Expected results:
Test is passed
Actual result:
Test is Failed
Reproducibility:
100% Fail
Workaround:
---
Impact:
---
Description of the environment:
See (Detailed bug description)
Additional information:
http://
https:/
description: | updated |
Changed in mos: | |
status: | New → Confirmed |
Changed in mos: | |
assignee: | nobody → MOS Ironic (mos-ironic) |
After merge of https:/ /review. fuel-infra. org/#/c/ 18323/ swarm job became 'green'.