missed 7 meters and one meter need to be removed under ipmi protocal

Bug #1436635 reported by Xin, Xiaohui
6
This bug affects 1 person
Affects Status Importance Assigned to Milestone
OpenStack Dashboard (Horizon)
Fix Released
Undecided
Xin, Xiaohui

Bug Description

We have added ipmi meters in "Resource Usage" panel. And we missed 7 meters under ipmi protocal and the one of the old meter needs to be removed.

Changed in horizon:
assignee: nobody → Xin, Xiaohui (xiaohui-xin)
status: New → In Progress
Revision history for this message
OpenStack Infra (hudson-openstack) wrote : Fix proposed to horizon (master)

Fix proposed to branch: master
Review: https://review.openstack.org/167886

Revision history for this message
OpenStack Infra (hudson-openstack) wrote : Fix merged to horizon (master)

Reviewed: https://review.openstack.org/167886
Committed: https://git.openstack.org/cgit/openstack/horizon/commit/?id=f75a52d2b3f7bfeaa8cb47db182f485d2ab659b1
Submitter: Jenkins
Branch: master

commit f75a52d2b3f7bfeaa8cb47db182f485d2ab659b1
Author: XinXiaohui <email address hidden>
Date: Mon Mar 30 09:37:45 2015 +0800

    Add 7 missed meters in Resource Usage Panel.

    We have made the ipmi meters visible in "Resource Usage" panel.
    Now a meter should be removed and other 7 meters missed need to
    be added in. All these meters are under IPMI protocol.

    Change-Id: I34ed7187347ff4a4cfac7c572f16e03f1fe15b39
    Closes-Bug: #1436635

Changed in horizon:
status: In Progress → Fix Committed
Thierry Carrez (ttx)
Changed in horizon:
milestone: none → kilo-rc1
status: Fix Committed → Fix Released
Thierry Carrez (ttx)
Changed in horizon:
milestone: kilo-rc1 → 2015.1.0
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.