For redundant Arista switches do not fail L3 operations if one switch is available
Bug #1373652 reported by
Sukhdev Kapur
This bug affects 1 person
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
neutron |
Fix Released
|
Low
|
Akihiro Motoki |
Bug Description
If Arista HW is configured in MLAG (redundancy mode), allow the L3 operation to succeed if configuration was successful on at least on one of the switches.
tags: | added: juno-rc-potential |
Changed in neutron: | |
assignee: | Sukhdev Kapur (sukhdev-8) → Akihiro Motoki (amotoki) |
Changed in neutron: | |
milestone: | none → kilo-1 |
importance: | Undecided → Low |
tags: |
added: juno-backport-potential removed: juno-rc-potential |
Changed in neutron: | |
status: | Fix Committed → Fix Released |
Changed in neutron: | |
milestone: | kilo-1 → 2015.1.0 |
To post a comment you must log in.
Fix proposed to branch: master /review. openstack. org/123886
Review: https:/