check-tempest-dsvm-neutron-full fails in TestNetworkAdvancedServerOps.test_server_connectivity_resize with SSH timeout

Bug #1366545 reported by Doug Hellmann
6
This bug affects 1 person
Affects Status Importance Assigned to Milestone
neutron
New
Undecided
Unassigned

Bug Description

http://logs.openstack.org/45/119145/1/check/check-tempest-dsvm-neutron-full/ba54781/console.html#_2014-09-05_19_30_08_351

Resize test fails to connect to the VM during the check-tempest-dsvm-neutron-full job.

Revision history for this message
Jacek Świderski (jacek-swiderski) wrote :

This duplicates bug 1349617 which was already fixed for neutron full job

To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.