[Trunk/7.0] mrp operation scheduled dates not generated

Bug #1236782 reported by Grzegorz Grzelak (OpenGLOBE.pl)
8
This bug affects 1 person
Affects Status Importance Assigned to Milestone
Odoo Addons (MOVED TO GITHUB)
Confirmed
Low
OpenERP Publisher's Warranty Team

Bug Description

OpenERP 7.0-20131007-231023, Ubuntu 12.04 postgres 9.1

Install fresh db with module mrp_operations.

Create products, boms, Workcenters, routings with operations.

If you generate MO the operations (Work Orders) doesn't contain Scheduled Date.

It worked in build from openerp-7.0-20130806 but it doesn't work in some subsequent nightly builds.

On the screen the black Work Orders were created using build from August (openerp-7.0-20130806-231058.tar.gz). The red ones are created using builds from late September and current

Tags: maintenance
Revision history for this message
Grzegorz Grzelak (OpenGLOBE.pl) (grzegorz-og.pl) wrote :
summary: - mrp operation scheduled dates not generated
+ [7.0] mrp operation scheduled dates not generated
Revision history for this message
Twinkle Christian(OpenERP) (tch-openerp) wrote : Re: [7.0] mrp operation scheduled dates not generated
Changed in openobject-addons:
status: New → Incomplete
Revision history for this message
Grzegorz Grzelak (OpenGLOBE.pl) (grzegorz-og.pl) wrote :

@ #2
You confirmed my bug. Try this using OpenERP before August you will see that Work Orders contains Scheduled dates just after creation of Manufacturing Order. I generated Manufacturing Order from SO and running the scheduler. So Manufacturing Order should be confirmed But just confirmed NOT started.

Scheduled Dates should appear for scheduling BEFORE Starting a Manufacturing Order and BEFORE starting Work Order.

Please try it with version from 20130806 it worked correctly there.

Changed in openobject-addons:
status: Incomplete → New
Amit Parik (amit-parik)
Changed in openobject-addons:
assignee: nobody → OpenERP R&D Addons Team 2 (openerp-dev-addons2)
importance: Undecided → Low
status: New → Confirmed
summary: - [7.0] mrp operation scheduled dates not generated
+ [Trunk/7.0] mrp operation scheduled dates not generated
Changed in openobject-addons:
assignee: OpenERP R&D Addons Team 2 (openerp-dev-addons2) → OpenERP Publisher's Warranty Team (openerp-opw)
tags: added: maintenance
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.