Inconsistencies in Operations Manual 9.0
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
Open Rails |
Fix Released
|
Low
|
cjakeman |
Bug Description
I believe there are some inconsistencies in Operations Manual 9.0.
1) Page 16 "Route File (.trk) – Level Crossings are supported. Overhead wire is not supported." Overhead wire seems to be supported instead
2) Pages 16-17 for some file types, like e.g. ssource.dat, the more correct comment should be" Open Rails does not provide a Route Editor in the current release" and not "Not supported at the present time."
3) Page 21 HUD dispatcher information: what is described is the "old" version of such information; the dispatcher information has been widely modified and extended
4) Pages 21 and 22, starting from last paragraph of page 21: I wonder if such information about AI's is up to date
5) Page 34: diesel engines switch on/switch off: key used is Y and not Z, as noticed by someone in the Elvas Tower forum
6) Page 55: about AI trains uncoupling cars by inserting in path a waiting point with specific parameters: I believe that this unfortunately has been removed by rewriting signalling.
Changed in or: | |
status: | Fix Committed → Fix Released |
On point 5 Chris has been faster than me.