Grabbing loose consist on bridge
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
Open Rails |
Fix Released
|
High
|
rdamurphy |
Bug Description
Scenario....
Active train proceeding at 6 kmph on main track, and will pass under bridge with loose consist present.
As train passes under bridge, loose consist is snapped to the front coupler of the active consist...
Screenshots:
https:/
https:/
https:/
https:/
Does not happen when speed is > 10 kmph.
Route is in development, but can provide a working copy if needed for testing...
Should be easy to replicate -- coupler for loose consist appears to be within 2-4m of lower track's centerline, and clearance is ~7m between tracks.
Changed in or: | |
assignee: | nobody → rdamurphy (rdamurphy) |
status: | New → Confirmed |
Changed in or: | |
milestone: | none → 0.9 |
tags: | added: physics |
Changed in or: | |
importance: | Undecided → High |
Changed in or: | |
status: | Confirmed → In Progress |
Changed in or: | |
milestone: | 0.9 → 1.0 |
Changed in or: | |
status: | In Progress → Fix Committed |
no longer affects: | rotor-control-software |
Changed in or: | |
status: | Fix Committed → Fix Released |
Correction... it does happen > 10 kmph.... single or multi with or without dispatcher view open....
Using experimental 1413