mrp_advanced_operations: Wrong Production State

Bug #1067292 reported by Daniel Stenlöv
6
This bug affects 1 person
Affects Status Importance Assigned to Milestone
Avanzosc developments
Fix Released
Undecided
Unassigned

Bug Description

The production state of a production is sometimes faulty. If you produce half of the production and cancel the rest it will show up in the form view as Cancelled. However it would be better to make a status as 'partly done' or something like that to show that the some of the items where produced.

Tags: mrp-6.1

Related branches

tags: added: mrp-6.1
summary: - [mrp_advanced_operations] Wrong Production State
+ mrp_advanced_operations: Wrong Production State
Revision history for this message
Daniel Campos (Avanzosc) (dani-ds) wrote :

We have done some changes in this area.

Changed in avanzosc:
status: New → Fix Released
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.