mrp_advanced_operations: Wrong Production State
Bug #1067292 reported by
Daniel Stenlöv
This bug affects 1 person
Affects | Status | Importance | Assigned to | Milestone | |
---|---|---|---|---|---|
Avanzosc developments |
Fix Released
|
Undecided
|
Unassigned |
Bug Description
The production state of a production is sometimes faulty. If you produce half of the production and cancel the rest it will show up in the form view as Cancelled. However it would be better to make a status as 'partly done' or something like that to show that the some of the items where produced.
Related branches
tags: | added: mrp-6.1 |
summary: |
- [mrp_advanced_operations] Wrong Production State + mrp_advanced_operations: Wrong Production State |
To post a comment you must log in.
We have done some changes in this area.