GTG

Hidden part of calendar

Bug #1032745 reported by Izidor Matušov
18
This bug affects 2 people
Affects Status Importance Assigned to Milestone
GTG
Fix Released
Low
Parin Porecha

Bug Description

Steps to reproduce:
1, Put task editor in to the top left corner
2, Open the calendar for start date

Part of the calendar is hidden because it is displayed outside the screen.

If it is possible, we should display the calendar inside the task editor window.

Related branches

Revision history for this message
Nimit Shah (nimit-svnit) wrote :

Shall we add it in the blueprint for task editor rework?

Revision history for this message
Izidor Matušov (izidor) wrote :

Nimit> I've added it to the blueprint. Thanks for notice. However, this bug could be solved outside editor rework, and should be easy to fix.

tags: added: love
Abdul Rauf (haseeb)
Changed in gtg:
assignee: nobody → Abdul Rauf (haseeb)
Izidor Matušov (izidor)
Changed in gtg:
status: Confirmed → In Progress
Izidor Matušov (izidor)
Changed in gtg:
status: In Progress → Confirmed
assignee: Abdul Rauf (haseeb) → nobody
Changed in gtg:
assignee: nobody → Parin Porecha (parinporecha)
Izidor Matušov (izidor)
Changed in gtg:
milestone: 0.4 → 0.3.1
status: Confirmed → Fix Committed
Nimit Shah (nimit-svnit)
Changed in gtg:
status: Fix Committed → Fix Released
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Duplicates of this bug

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.