Automatically calculate Completed Progress

Bug #1018034 reported by Eduardo Xavier
6
This bug affects 1 person
Affects Status Importance Assigned to Milestone
Eventum
Fix Released
Low
Elan Ruusamäe

Bug Description

There is a field about issue progress completion which could be more worthy. That information should be calculated automatically by means of taking the estimated time and comparing it to real time allocated. The real time allocated is the sum of all activities.

This could be a project option and should be trigger in the same moment the LAST UPDATED action is performed.

In the end, we would use a javascript lib to write a PieChart canvas. Rapahel Js Lib is the one to do it.

Tags: time
summary: - Automatically calculate a Completed Progress and showing that in the
- issue
+ Automatically calculate Completed Progress
Elan Ruusamäe (glen666)
Changed in eventum:
importance: Undecided → Low
milestone: none → 2.4
Elan Ruusamäe (glen666)
Changed in eventum:
milestone: 2.4 → future
Revision history for this message
Elan Ruusamäe (glen666) wrote :

This can be done with subscriber: https://github.com/eventum/eventum/pull/473

Elan Ruusamäe (glen666)
Changed in eventum:
assignee: nobody → Elan Ruusamäe (glen666)
milestone: future → 3.0
status: New → Fix Released
To post a comment you must log in.
This report contains Public information  
Everyone can see this information.

Other bug subscribers

Remote bug watches

Bug watches keep track of this bug in other bug trackers.